Instruction manuals

Commissioning Checklist

Published
of 6
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Related Documents
Share
Description
Commissioning Method
Transcript
  ECIICESE03 Inspection, testing and commissioning of electrical installations (plant)   ECIICESE03 Inspection, testing and commissioning of electrical installations (plant)   1 Overview This standard is about the inspecting, commissioning and testing of electrical installations (plant) in engineering construction. You will need to be able to perform the appropriate tests, ensure that the installation is in accordance with regulations and prepare a test record using the correct tools and techniques and adhering to Health and safety legislation, regulations and safe working practices. In the context of this standard, your responsibility is to interpret and work within given specifications, selecting techniques and making variations to achieve the best possible result. In some cases, you may still be expected to refer to others for final authorisation, even though you remain responsible for identifying and implementing decisions. This standard is for Electrical installation engineers and others that install electrical systems and equipment.  ECIICESE03 Inspection, testing and commissioning of electrical installations (plant) ECIICESE03 Inspection, testing and commissioning of electrical installations (plant)   2   Performance criteria You must be able to: P1 work safely at all times, complying with health and safety and other relevant legislation, regulations, guidelines and local rules or procedures P2 ensure that the work environment , material, equipment and tools are suitably prepared for the activities to be undertaken P3 identify the people that need to be provided with technical and functional information P4 obtain and interpret the required information and specification for the job to be done P5 i dentify accurately the means of electrical isolation  and carry out isolation   P6 confirm that your test instruments are P6.1 appropriate P6.2 fit for purpose P6.3 calibrated P7 plan and agree the schedule for inspecting and testing procedures  P8 conduct an inspection P9 conduct the required tests P10 confirm the installation meets the required regulations and standards P11 prepare a formal record of testing which confirms the safety and integrity of the installation P12 commission the installation according to specification and defined parameters P13 reinstate the work area  P14 deal promptly and effectively with problems within your control and report those that cannot be solved  ECIICESE03 Inspection, testing and commissioning of electrical installations (plant) ECIICESE03 Inspection, testing and commissioning of electrical installations (plant)   3   Knowledge and understanding You need to know and understand: K1 relevant legislative, regulatory and local requirements or procedures and safe working practices K2 preparation and reinstatement requirements in respect of the work area, material, and equipment, and the possible consequences of incorrect actions in these areas K3 how to identify people that need to be supplied with technical and functional information relating to the task  K4 risk assessments and method statements (RAMs) and other related documentation and procedures K5 safe isolation procedures K6 engineering drawings and related specifications  K7 the tools, terminology and techniques for inspecting, testing and commissioning electrical installations including K7.1 identification of inspection requirements K7.2 selection of appropriate calibrated testing equipment K7.3 sequencing of tests for fault identification K7.4 setting up of equipment to predetermined parameters K7.5 releasing of equipment into service K8 your responsibilities for ensuring care and security of tools and equipment used K9 reporting and documentation procedures K10 your responsibilities with regard to reporting lines and procedures in your working environment  ECIICESE03 Inspection, testing and commissioning of electrical installations (plant) ECIICESE03 Inspection, testing and commissioning of electrical installations (plant)   4   Additional Information Scope/range Work environment  Typical work environments could include: 1 at height 2 confined spaces 3 controlled operational and offshore installations 4 designated work areas 5 engineering construction sites 6 existing plants and structures 7 fabrication workshops 8 nuclear sites 9 onshore and offshore installations 10 potential explosive atmospheres 11 shafts 12 shipyards 13 tunnels 14 working inside plant and systems 15 working on access structures (scaffold) Electrical isolation This could include: 1 getting appropriate authorisation including Permit to Work 2 identifying the correct isolations and disconnections required 3 correct sequence of isolations and disconnections 4 safety methods for maintaining isolations and disconnections Testing procedures These could include testing: 1 continuity 2 earth fault loop impedance 3 insulation resistance 4 operation of electrical components 5 polarity
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks