itp minipile
Transcript
  Client : PT. KRAKATAU DAYA LISTRIK Doc. No. :Main Contr. : PT PP (Persero) Tbk. Revision No. :Project : KDL 120 MW COMBINED CYCLE POWER PLANT Date :Location : Cilegon, Banten NODOCUMENTQCPP SNCL KDL/BVI INSPECTION&TESTPLANMINIPILINGWORK ITEMACTIVITIES VERIFYING INSPECTIONAPPROVAL 1. Construction Specification1.1. Technical Specification1.1.1. Review Approval technical specification R A R/A1 1.1.2. Finalize deviation, Amendments or Queries R A R/A1.1.3. Drawing for construction R A R/A1.2. Piling Procedure R A R/A2. Material Inspection2.1. Verification document / Mill Certificate A1 R/A2.2. Check for damage Inspection Report A1 A22.3 Dimensional check if necessary Inspection Report A1 A23. Installation Work3.1 Survey coordinat point Drawing A1 SW3.1.1. Tolerance for X and Y coordinates are 75 mm Inspection Report A1 R/A3.1.2. Tolerance for longitudinal axis is 1 : 100. Inspection Report A1 R/A3.2 Welding Joint Procedure, Inspection Report A1 A2R/ASWSWApproved Technical Spec.SWRRSWApproved ProcedureApproved Technical Spec.  NODOCUMENTQCPP SNCL KDL/BVIITEMACTIVITIES VERIFYING INSPECTIONAPPROVAL 4. Final Set4.1. Record the penetration of each pile Procedure, recording A1 A5. Piling Test5.1. PDA test, 2 % from total pile Applicable Standar R A R/A6. Documentation6.1 R AAll inspection as per ITP has been done & the inspection reporthas already been generated and signed Contract, Tech. Spec., drawing, R/AThe pile and penetration condition on the Final Set shall be metTesting shall be done at the approved locationR6.2 A1 - 100% INSPECTION OR TEST ; Execution or inspection by KPIA2 - RANDOM INSPECTION ; Inspection at random sample.W - WITNESS ; Witness of inspection by Client / Owner and Sub-Contractor may proceed if Client / Owner not appearance at the pointed timeWitness point shall be given by NotificationSW - SPOT WITNESS ; Witness of inspection by Client / Owner and to be done at spot or random ( random sample )R - REVIEW ; Review of certificate / document to ensure compliance with specification.A - APPROVAL ; Approval documentation ( Procedure, Work instruction, Inspection report, etc. ) reportAll NCR or any deviation of contract already closed anddocumented

QHSE Docket

Jul 23, 2017
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks