Documents

Key Port Performance Indicator

Categories
Published
of 15
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Related Documents
Share
Description
It will help to monitor the port performance
Transcript
  2008-092009-102010-112011-122013-14No of Ships arrieved at the PortNo of Ships sailed after cargo operationAverage gangshift output (tonnes)Idle Time at berth ( %)Percentage Berth Occupancy PERFORMANCE INDICATORS Traffic (in 000 Tonnes)Average Time Spent at Berth (Days)Average Pre-berthing detention due to non-availability of berth (Days)Average Turn-round time (Days)Average size of parcel per ship (Tonnes)Average quantum of cargo handled per ship day (Tonnes)  14-Jan13-Dec13-JanNo of Ships arrieved at the PortNo of Ships sailed after cargo operationIdle Time at berth ( %)Percentage Berth OccupancyAverage gangshift output (tonnes) PERFORMANCE INDICATOR Average Pre-berthing detention due to non-availability of berth (Days)Average Time Spent at Berth (Days)Traffic (in 000 Tonnes)Average Turn-round time (Days)Average size of parcel per ship (Tonnes)Average quantum of cargo handled per ship day (Tonnes)  SL NOINDICATORS 1Average Ship Turn Arround Time2Average Tonnage Per day (Hours)3Average Vessel Time at Berth4Average vessel time outside5aFor BerthbDue to Rain cOther Causes6Average Waiting Rate7Tons per gang hour8TEUs per crane (hook) hour9Dwell time10Berth throughput11Throughput per linear meter12Berth occupancy rate (%)13Berth utilization rate (%)14Income (expenditure) per GRT 15Operating surplus per ton of cargo handled16Rate of return on turnoverAverage waiting (idle) time    BASIS OF COMPUTATION Total Hrs vessel stay in port / Total no of VesselsTotal tonnage of cargo Handled/ Total no of vessel days (Hours)Total hours alongside berths /Total no. of vessels berthedTotal hours in port - total hours berth alongside /Total no. of vessel callsTotal hours of vessels waiting for berth/Total no. of vessels berthedTotal hours of work stoppage due to rain/Total no. of vessels workedTotal hours of stoppage attributed to the Causes/Total no. of vessels workedTotal hours of vessels waiting for berth/Total hours alongside berthsTotal tonnage handled/Total no. of gangs x total no. of hoursworkedTotal no. of TEUs handled/Total no. of cranes used x total no. of hours cranes workedTotal no. of cargo tons x days in port/Total tonnage of cargo handledTotal tonnage of cargo handled at berths/Total no. of berthsTotal tonnage of cargo handled at berths/ Total length of berths of wharf Total time of ships at berths x 100 /Total no. of berths x 360 daysTotal time that ships actually work x 100/Total time of ships alongsideTotal income (expenditure)/(or NRT) of shipping Total GRT (or NRT) of shippingOperating surplus /cargo handled Total tonnage of cargo handledOperating surplus/Operating income KEY PERFORMANCE INDICATOR
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks