Documents

Stack welding

Categories
Published
of 76
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Related Documents
Share
Description
stack welding procedure
Transcript
  01ApprovedWork may proceed.02Approved with commentsWork may proceed subject to compliance with and incorporation of comment.03RejectRevise and resubmit.04INFORMATION ONLY Accepted for information only. This approval does not relieve the vendor of his responsibility to meet purchase order conditions relating to duty, specifications, materials, design, construction and delivery requirements DateCHKDREVDAPPD 0B11-Sep-13FOR FINAL/ CERTIFIEDDESCLQMMEG13-Feb-13ISSUED FOR APPROVALDESCLQMMEG    A REV.NO.DATE05-Aug-12ISSUED FOR APPROVALDESCLQMMEG 1670-933 DOC. NO. 1151D-ME300J1-COMM-927 DESCRIPTIONPREDCHKDREVDAPPD  ARAMCO OVERSEAS COMPANY B.V PROJECT NO. : PACKAGE #3: 11051D PROJECTTITLE WASIT SRU & UTILITIES PROJECT, PACKAGE #3 DOCUMENTTITLE WELD PROCEDURE SPECIFICATION (WPS,PQR,WELDING MAP  AND REPAIR PROCEDURE) SRU STACK CompanyPO NO. WRCI-Q71-32-C101 TOTAL SHEETS 76 Vendor DOC. NO.Contractor PO NO. 11051D-PO-ME-3-ME300-J1 SHEET SIZE  A4    WASIT SRU & UTILITIES PROJECT, PACKAGE # 3 Doc. No. DES-1744-QA&QC-09 Descon Engineering FZE. WELDBOOK Rev. 00  Page   1   of    75   Engineering & Construction WELDBOOK FOR SRU STACK Document No: DES-1744-QA&QC-09 Purchase Order No.: 12166-1670-08 Equipment/Material: SRU STACK REV DATE DESCRIPTION PREPARED CHECKED APPROVED 00 11-9-2013 FOR FINAL/ CERTIFIED B 7/2/2013 Issued for Final Approval MAJ MAJ SAKET KUMAR  A 4/7/2012 Issued for client review SRF MAJ SAKET KUMAR DESCON ENGINEERING FZE   Doc. No. : DES-QA&QC/FRM-57 DESCON ENGINEERING LTD.  Rev. : 00 WELD MATRIX  Date : Sep 05,2006 Page : COMPANY NAME: REFRENCE DRAWINGREFRENCE WPS(Index)Sr#1 HMW-11-B/C-61 2 DES-11-B/C-61 3 45 DES-11-F/B-86 6 78 9 -Client HAMWORTHY COMBUSTION ENGINEERING SRL -Project No./Project Name: WASIT SRU & UTILITIES PROJECT, PACKAGE # 3 -Descon Doc #  DES-1744-QA&QC-09 -Equipment #-Inspection Authority QC-DES /Client DES-B-15DES-88-A/F-41AMW-A/D-08-08AMW-A/D-07-08DES-18-A/F-42 1of 2 11051D-ME300JI-COMM-507 SRU STACK Supporting PQR No(s)Welding Procedure Specification No DES-11-B/C-61DES-A/B-25 HAMWORTHY COMBUSTION ENGINEERING SRL DES-11-A/B-70 HMW-11-B-61A DES-18-B-25BDES-18-B-25DES-88-A/B-26DES-F/B-86DES-A/B-62DES-B-15 REMARKS: -WPS:In accordance withASME IXAFNOR 32-107EN 287.1 / EN 288.3AWS D1.1Other  DISTRIBUTION: -Production-QC-Client REVISION AND STATUS. Rev.DescriptionInit.DateInit.DateInit.dateIssuedCheckedApproved 7-Feb-137-Feb-134-Jul-12MAJ4-Jul-12SK SK MAJ0Issued for Client ReviewSRF4-Jul-121Issued for Final Approval7-Feb-13MAJ X Do not Duplicate, Controlled Copy If Stamped In Red DESCON Engineering FZE.   Doc. No. : DES-QA&QC/FRM-57  Rev. : 00 Date : Sep 05,2006Page: 2 of 2 IMPACTTEST:NO DESCON ENGINEERING LTD.WELD MATRIX Item#SRUSTACKPWHT:NO   Full PenetrationAs per drawing Full PenetrationAs per drawing Full PenetrationAs  per drawing Applicable WPSSupporting PQR DES-11-B/C-61SMAW+SAW Applicable Welding Process DES-11-B/C-61 Joint DetailFiller Metal SMAW+SAW E7018+EH12K E7018+EH12K  P1 To P1  All LS WELDS(P8 to P8) DES-88-A/B-26 All CS WELDS (P1 to P1) HMW-11-B/C-61 P1 To P1 Jiont TypeMaterial All LS WELDS(P1 to P1) HMW-11-B/C-61 DES-A/B-25GTAW / SMAW ER316L / E316L P8 to P8 Weld No. Full PenetrationAs per drawing Full PenetrationAs per drawing Compound filletAs per drawingFull PenetrationAs per drawingDES-A/B-25 All CS WELDS(P8 to P8) DES-88-A/B-26 ER316L / E316L P8 to P8GTAW / SMAWDES-11-A/B-70DES-A/B-62GTAW/SMAW ER70S6/E7018 P1 To P1 ALL CS WELDS(P1 to P8) DES-18-B-25DES-B-15SMAW E309L-16 P1 To P8 (K1/K2/K5)A TYP HMW-11-B-61ADES-11-B/C-61SMAW E7018 P1 To P1 (K1/K2/K5)B TYP   Full PenetrationAs per drawingCompound filletAs per drawingFull PenetrationAs per drawingFull PenetrationAs per drawingDES-A/B-62GTAW/SMAW (K1/K2/K5)C TYP DES-11-A/B-70 (K3/K6)A TYP HMW-11-B-61ADES-11-B/C-61SMAW E7018 P1 To P1P1 To P1 ER70S6/E7018 P1 To P1 (K3/K6)B TYP DES-11-A/B-70DES-A/B-62GTAW/SMAW ER70S6/E7018 P1 To P1 (K3/K6)C TYP DES-11-A/B-70DES-A/B-62GTAW/SMAW ER70S6/E7018  Full PenetrationAs per drawingCompound filletAs per drawingFull PenetrationAs per drawingCompound filletAs per drawingP1 To P1DES-11-A/B-70P1 To P1 K4B DES-11-A/B-70DES-A/B-62GTAW/SMAW ER70S6/E7018 K7A HMW-11-B-61ADES-11-B/C-61SMAW E7018 DES-11-B/C-61SMAW E7018 P1 To P1 K7B GTAW/SMAW ER70S6/E7018 ------ K8A HMW-11-B-61ADES-A/B-62P1 To P1Compound filletDetail 13FilletDetail 30Compound filletDetail 30Full PenetrationDetail 30SMAW E7018 P1 To P1 M1C HMW-11-B-61 M1A DES-11-F/B-86DES-F/B-86SMAW/FCAW E7018/E71T-1 P1 To P1 A1 HMW-11-B-61ADES-11-B/C-61 M1B HMW-11-B-61ADES-11-B/C-61SMAW E7018 DES-11-B/C-61SMAW+SAW E7018+EH12K  P1 To P1P1 To P1FilletDetail 10FilletAs per drawingCompound filletDetail 18,21,23,27,28Full PenetrationDetail 16Detail 19,20,22,24 Name Plate Support DES-11-F/B-86DES-F/B-86SMAW/FCAW E7018/E71T-1 P1 To P1 Trunnion welds DES-11-F/B-86DES-F/B-86SMAW/FCAW E7018/E71T-1 P1 To P1 Earthing Lug DES-18-B-25DES-B-15SMAW E309L P1 To P8 PIPE SUPPORT FOR FLUE GAS DUCT DES-11-F/B-86DES-F/B-86SMAW/FCAW E7018/E71T-1 P1 To P1e,,,FilletDetail 3FilletDetail 14FilletDetail 11Compound filletDetail 4SMAW/FCAW ER70S6/E7018 P1 To P1DES-11-F/B-86DES-F/B-86SMAW/FCAW E7018/E71T-1 P1 To P1   ----- /-  o Box support DES-11-F/B-86DES-F/B-86SMAW/FCAW E7018/E71T-1 P1 To P1DES-F/B-86SMAW/FCAW E7018/E71T-1 P1 To P1 BASE RING ANCHOR CHAIR WELDS DES-11-F/B-86DES-F/B-86 Cable tray Support DES-11-F/B-86 Vent Holes

14-P0157

Jul 23, 2017

Magsalin vs. NOWN

Jul 23, 2017
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks